Toolbox Talk Record
Project / site: [Site name] Date: [Date] Time: [07:30] Duration: [10 minutes] Delivered by: [Name, role] Location on site: [Area]
Topic
[Working at height: ladders and podium steps]
Why this, why today
[e.g. "Ceiling grid installation starts on level 2 today; three crews will be working from podiums."]
Key points covered
[The hazard: falls from low height cause serious injuries]
[Use podium steps, not ladders, for work lasting more than a few minutes]
[Inspect equipment before use: locks, feet, guard rails; tag and remove anything damaged]
[Keep three points of contact; never overreach; move the podium instead]
[Keep the area below clear and barrier off where others pass]
Controls in place
Hazard | Control | Who checks |
|---|---|---|
[Fall from podium] | [Guard rails locked; wheels braked] | [Supervisor, daily] |
[Falling tools or materials] | [Tool lanyards; exclusion zone below] | [Each operative] |
[Uneven floor] | [Floor swept and protected; no work on ramps] | [Supervisor] |
Questions and concerns raised
[Question or concern]
[Question or concern]
Actions
Action | Owner | By when |
|---|---|---|
[Replace damaged podium P-07] | [Name] | [Today] |
[Order two more tool lanyards] | [Name] | [Date] |
Attendance
By signing, I confirm I attended this talk and understood the points covered.
Name | Company / trade | Signature |
|---|---|---|
[Name] | [Trade] | |
[Name] | [Trade] | |
[Name] | [Trade] | |
[Name] | [Trade] | |
[Name] | [Trade] | |
[Name] | [Trade] |
Supervisor’s signature: ______________