Site Safety Plan: [Project Name]
Address: [Site address] · Contractor: [Company] · Site manager: [Name, phone] · Safety lead: [Name, phone]
Adapt this plan to the regulations that apply where you work. It does not replace a competent safety professional.
Responsibilities
Role | Responsibility |
|---|---|
Site manager | [Overall safety, inductions, daily checks] |
Safety lead | [Inspections, toolbox talks, incident investigation] |
All workers | [Follow the plan, wear PPE, report hazards] |
Key hazards and controls
Hazard | Control measures | Owner |
|---|---|---|
Working at height | [Guardrails, harnesses, scaffold inspections] | [Name] |
Excavations | [Shoring, barriers, daily inspection] | [Name] |
Moving plant | [Banksman, exclusion zones, trained operators] | [Name] |
Electrical | [Lock-out/tag-out, RCD protection] | [Name] |
Manual handling | [Mechanical aids, team lifts] | [Name] |
Required PPE
Hard hat, safety boots and high-visibility clothing at all times
[Eye, hearing and hand protection for specific tasks]
Training and induction
[Site induction content, required certifications, toolbox talk schedule.]
Emergency procedures
Emergency number: [911 / 999 / 112]
Nearest hospital: [Name, address]
Muster point: [Location]
First aiders: [Names]
Incident reporting
Report all incidents and near misses to the site manager immediately and record them on the Incident Report form.
Site rules
[Sign in and out every day]
[No unauthorised visitors]
[Keep walkways clear]