Skip to content
GraviPointThe Centre of Productivity
  • AI AgentNew
  • Pricing
  • Community
Log inGet started free
TemplatesConstruction & EngineeringSite Safety & QualityJob Hazard Analysis (JHA)

SpreadsheetSite Safety & QualityFree

Job Hazard Analysis (JHA)

Break a task into steps, rate each hazard for severity and likelihood, and record the controls that reduce it.

Shown with sample data

Colour

Job Hazard Analysis (JHA)

Break a task into steps, rate each hazard for severity and likelihood, and record the controls that reduce it.

Hazards assessed
7
Risk reduction from controls
55%
Still high after controls
0
Highest residual risk
10
Entries by hazard type
  • Fall from height2
  • Struck by1
  • Electrical1
  • Manual handling1
  • Dust & fumes1
  • Fire1
Share of entries by hazard type
  • Fall from height229%
  • Struck by114%
  • Electrical114%
  • Manual handling114%
  • Dust & fumes114%
  • Fire114%

How to use it

  1. 1Walk through the task with the people who will do it.
  2. 2Rate severity and likelihood honestly before controls.
  3. 3Choose controls from the top of the hierarchy: eliminate, substitute, engineer.
  4. 4Do not start while any residual risk is High.

In this workbook

  • About
  • What’s included
  • How to use
  • Related resources

About this template

Before a risky task, think it through on paper. List each step, the hazard it creates and who could be hurt; rate severity and likelihood from 1 to 5 before and after controls. The sheet scores each risk, shows the reduction your controls achieve and flags anything still high.

Who it’s for

  • Method statements and permits to work
  • Non-routine and high-risk tasks
  • Briefing the crew before they start

What’s included

  • Hazards sheet: One row per hazard. Risk = severity × likelihood; 15 or more is High, 8 to 14 Medium.
  • Summary by Hazard type sheet: The number of entries for each hazard type, calculated from the Hazards sheet.

How to use it

  1. 1Walk through the task with the people who will do it.
  2. 2Rate severity and likelihood honestly before controls.
  3. 3Choose controls from the top of the hierarchy: eliminate, substitute, engineer.
  4. 4Do not start while any residual risk is High.
Related searchesjob hazard analysisjha templatejob safety analysisrisk assessment matrixtask risk assessment

Details

Format
Spreadsheet
Category
Site Safety & Quality
Sheets
2
Setup
10 min
Level
Intermediate
Price
Free

Download a copy

Downloads need a free account.

SpreadsheetSite Safety & QualityFree

Job Hazard Analysis (JHA)

Break a task into steps, rate each hazard for severity and likelihood, and record the controls that reduce it.

A free account keeps your copy safe so you can come back to it. Have one? Log in

Download a copy

Downloads need a free account.

Details

Format
Spreadsheet
Category
Site Safety & Quality
Sheets
2
Setup
10 min
Level
Intermediate
Price
Free

Your copy is private to you.

More site safety & quality templates

View all

Site Safety Plan: Project Name

Address: Site address · Contractor: Company · Site manager: Name, phone · Safety lead: Name, phone

Responsibilities

RoleResponsibility
Site managerOverall safety, inductions,
Safety leadInspections, toolbox talks,

Key hazards and controls

HazardControl measuresOwner
Working at heightGuardrails, harnesses, scafName
ExcavationsShoring, barriers, daily inName

Required PPE

  • •Hard hat, safety boots and high-visibility clothing at all times
  • •Eye, hearing and hand protection for specific tasks
DocumentSite Safety & Quality

Site Safety Plan

Site-specific hazards, controls, PPE, emergency procedures and responsibilities.

45 min setupPreview

Site Safety Inspection Checklist

Weekly inspection of housekeeping, PPE, scaffolding, electrical and fire safety.

Site *

Inspected by *

Date *

Submit inspection
FormSite Safety & Quality

Site Safety Inspection Checklist

Weekly inspection of housekeeping, PPE, scaffolding, electrical and fire safety.

10 min setupPreview

Toolbox Talk Record

Project / site: Site name Date: Date Time: 07:30 Duration: 10 minutes Delivered by: Name, role Location on site: Area

Topic

Working at height: ladders and podium steps

Why this, why today

e.g. "Ceiling grid installation starts on level 2 today; three crews will be working from podiums."

Key points covered

  • 1.The hazard: falls from low height cause serious injuries
  • 2.Use podium steps, not ladders, for work lasting more than a few minutes
  • 3.Inspect equipment before use: locks, feet, guard rails; tag and remove anything
DocumentSite Safety & Quality

Toolbox Talk Record

A short safety briefing sheet with the topic, key points, questions raised and an attendance sign-in.

10 min setupPreview

Practical guides and new resources, monthly.

One short email with new templates, calculators and how-tos. Unsubscribe any time.

GraviPointThe Centre of Productivity

Find the right resource. Make it work for you. Get things done with spreadsheets, documents, forms and calculators you can use right in your browser.

support@gravipoint.com
  • @gravipoint
  • @GraviPoint
  • GraviPoint
  • 𝕏@gravipoint

Templates

  • All templates
  • Budgets & expenses
  • Invoices & billing
  • Project management
  • HR & people
  • Inventory & stock
  • Sales & CRM
  • Financial calculators

Popular

  • Monthly budget
  • Invoice
  • Employee shift schedule
  • Weekly timesheet
  • Project plan & Gantt chart
  • Inventory tracker
  • Expense report
  • Mortgage calculator

Solutions

  • Individuals & households
  • Freelancers & consultants
  • Founders & startups
  • Small business owners
  • Teams & operations
  • Students & educators

Company

  • About
  • Features
  • Pricing
  • Community
  • Journal
  • Contact
© 2026 GraviPoint. All rights reserved.
  • Privacy
  • Terms
  • Help centre
  • FAQ