Hazards assessed
7
Risk reduction from controls
55%
Still high after controls
0
Job Hazard Analysis (JHA)
Break a task into steps, rate each hazard for severity and likelihood, and record the controls that reduce it.
SpreadsheetSite Safety & QualityFree
Every permit and required inspection with dates, fees, results and what is holding up the next stage.
Shown with sample data
Every permit and required inspection with dates, fees, results and what is holding up the next stage.
A missed inspection means opening up finished work. List each permit and inspection in the order the project needs them, with application and scheduled dates, fee and result; the sheet shows what has passed, what is pending and what failed and needs re-inspection.
Download a copy
Downloads need a free account.