SpreadsheetSite Safety & QualityFree
Every inspection and test by stage with acceptance criteria, hold and witness points, responsible party, records and live hold-point status.
Shown with sample data
Every inspection and test by stage with acceptance criteria, hold and witness points, responsible party, records and live hold-point status.
An ITP agrees in advance what will be inspected or tested, against what criteria, by whom, and where work must stop until a hold point is released. List each inspection by stage with its acceptance criteria, reference, verifying record and type (hold, witness, review or surveillance); as results are recorded the status shows released hold points, work that must not proceed, overdue inspections and failures needing re-inspection, with a first-time pass rate.
At a hold point, work must not proceed past that stage until the nominated party has inspected and released it. At a witness point, the party is notified and may attend, but work can continue if they do not attend after proper notice.
Usually the contractor or subcontractor doing the work, reviewed and agreed by the owner’s engineer or quality manager before the work starts.
Inspections passed at the first attempt divided by inspections completed. A low rate signals workmanship or planning problems.
Download a copy