Hot Work Permit

Authorise welding, cutting, grinding and torch work only after fire precautions are checked, with a fire watch and final close-out.

Shown with sample data

Colour

Hot Work Permit

Authorise welding, cutting, grinding and torch work only after fire precautions are checked, with a fire watch and final close-out.

* Required

Permit details

People

Precautions confirmed

Close-out

  • About
  • What’s included
  • How to use
  • Questions
  • Related resources

About this template

Hot work is one of the leading causes of fires in buildings under construction and renovation. This permit follows the approach of NFPA 51B and OSHA 1910.252: it identifies the work, location and people, makes the permit authorising individual confirm each precaution (sprinklers, combustibles cleared within 35 feet, openings covered, extinguisher present, atmosphere tested), assigns a trained fire watch during the work and for at least 60 minutes after, and closes out with a final fire check.

Who it’s for

  • Welding, cutting, brazing and grinding on site
  • Torch-applied roofing
  • Maintenance work in occupied buildings
  • Insurer and client permit-to-work requirements

What’s included

  • Permit details (7 fields)
  • People (4 fields)
  • Precautions confirmed (8 fields)
  • Close-out (4 fields)

How to use it

  1. 1Consider whether hot work can be avoided (cold cutting, mechanical joints) before raising a permit.
  2. 2The person doing the work and the permit authorising individual inspect the area together.
  3. 3Tick each precaution only when it is in place; if one cannot be met, do not issue the permit.
  4. 4Keep the permit at the work location for the duration and limit it to one shift.
  5. 5The fire watch stays during the work and for at least 60 minutes after, then the area is checked and the permit closed.

Tips

  • NFPA 51B (2019 and later) calls for a fire watch of at least 60 minutes after hot work ends, plus monitoring for up to 3 hours depending on the hazard. Your insurer may require longer.
  • Combustibles that cannot be moved 35 feet (11 m) away must be covered with approved fire-resistant blankets or shields.
  • Test for flammable vapours near tanks, drains and coatings; work must not start above 10% of the lower explosive limit (LEL), and many sites require 0%.

Questions

What is hot work?

Any work that produces flames, sparks or heat capable of igniting materials: welding, cutting, brazing, soldering, grinding, thermal spraying and torch-applied roofing.

Who can sign a hot work permit?

A permit authorising individual (PAI) appointed by the site or facility, trained in hot work hazards, who is not the person doing the work.

How long is a hot work permit valid?

Normally for one shift or less, for the specific location and task. New location, new task or a change of conditions means a new permit.

Related searcheshot work permithot work permit formwelding permithot work permit templatenfpa 51b hot workfire watch checklist

Details

Format
Form
Category
Site Safety & Quality
Fields
23
Setup
10 min
Level
Beginner
Price
Free

Download a copy

Downloads need a free account.

FormSite Safety & QualityFree

Hot Work Permit

Authorise welding, cutting, grinding and torch work only after fire precautions are checked, with a fire watch and final close-out.

A free account keeps your copy safe so you can come back to it. Have one? Log in

Download a copy

Downloads need a free account.

Details

Format
Form
Category
Site Safety & Quality
Fields
23
Setup
10 min
Level
Beginner
Price
Free

Your copy is private to you.

More site safety & quality templates

View all
Job Hazard Analysis (JHA)2 sheets

Hazards assessed

7

Risk reduction from controls

55%

Still high after controls

0

ABCD
1StepTask stepHazardHazard type
21Deliver and unload roof trussesLoad swings or falls during liftStruck by
32Erect scaffold to eavesFall during erectionFall from height
43Carry trusses to positionBack and shoulder strainManual handling
54Fix trusses and bracingFall through open roofFall from height
Hazards
SpreadsheetSite Safety & Quality

Job Hazard Analysis (JHA)

Break a task into steps, rate each hazard for severity and likelihood, and record the controls that reduce it.

10 min setupPreview

Site Safety Plan: Project Name

Address: Site address · Contractor: Company · Site manager: Name, phone · Safety lead: Name, phone

Responsibilities

RoleResponsibility
Site managerOverall safety, inductions,
Safety leadInspections, toolbox talks,

Key hazards and controls

HazardControl measuresOwner
Working at heightGuardrails, harnesses, scafName
ExcavationsShoring, barriers, daily inName

Required PPE

  • •Hard hat, safety boots and high-visibility clothing at all times
  • •Eye, hearing and hand protection for specific tasks
DocumentSite Safety & Quality

Site Safety Plan

Site-specific hazards, controls, PPE, emergency procedures and responsibilities.

45 min setupPreview

Site Safety Inspection Checklist

Weekly inspection of housekeeping, PPE, scaffolding, electrical and fire safety.

Site *

Inspected by *

Date *

Submit inspection
FormSite Safety & Quality

Site Safety Inspection Checklist

Weekly inspection of housekeeping, PPE, scaffolding, electrical and fire safety.

10 min setupPreview

Practical guides and new resources, monthly.

One short email with new templates, calculators and how-tos. Unsubscribe any time.

GraviPointThe Centre of Productivity

Find the right resource. Make it work for you. Get things done with spreadsheets, documents, forms and calculators you can use right in your browser.

support@gravipoint.com
  • @gravipoint
  • @GraviPoint
  • GraviPoint
  • 𝕏@gravipoint

Templates

  • All templates
  • Budgets & expenses
  • Invoices & billing
  • Project management
  • HR & people
  • Inventory & stock
  • Sales & CRM
  • Financial calculators

Popular

  • Monthly budget
  • Invoice
  • Employee shift schedule
  • Weekly timesheet
  • Project plan & Gantt chart
  • Inventory tracker
  • Expense report
  • Mortgage calculator

Solutions

  • Individuals & households
  • Freelancers & consultants
  • Founders & startups
  • Small business owners
  • Teams & operations
  • Students & educators

Company

  • About
  • Features
  • Pricing
  • Community
  • Journal
  • Contact
© 2026 GraviPoint. All rights reserved.
  • Privacy
  • Terms
  • Help centre
  • FAQ