Construction Project Schedule
The build programme with planned and actual dates, progress weighted by duration, behind-schedule flags, a month-by-month bar chart and phase summaries.
SpreadsheetConstruction Project ManagementFree
Every warranty on a completed building with start date, term, expiry countdown, documents on file and a claims log.
Shown with sample data
Every warranty on a completed building with start date, term, expiry countdown, documents on file and a claims log.
A new building comes with dozens of warranties that start at substantial completion and expire on different dates, and claims made one day late are usually denied. List each warranty with the system, contractor or manufacturer, type, start date and term in months; the tracker works out the expiry date and days left, flags warranties expiring within 90 days so you can walk the building and file claims in time, and logs every claim through to resolution.
Usually at substantial completion of the work, or for equipment at start-up or beneficial use. Check each warranty’s wording; some start at shipment.
Under common contract forms such as AIA A201, the contractor must correct defective work found within one year of substantial completion. It is separate from, and does not shorten, other warranties or legal rights.
A no-dollar-limit warranty from the roofing manufacturer covering leaks from materials and workmanship for the full term, typically 15–30 years, if the installer was certified and inspections were done.