Quality Control Plan: [PH-220 Pump Housing Assembly]
Control plan number | [CP-PH220] |
Plan stage | ☐ Prototype ☐ Pre-launch ☒ Production |
Part number and revision | [220-1150 rev D] |
Part name | [Pump housing assembly PH-220] |
Customer | [Customer name], part number [C-88421] |
Supplier / plant | [Northwind Components, Riverside plant] |
Key contact and phone | [Quality engineer, phone] |
Core team | [Quality, manufacturing engineering, production, maintenance] |
Date (original / revised) | [Mar 2026] / [Nov 2026] |
Customer approval (if required) | [Name, date] |
1. Scope
This plan covers receiving, machining, assembly, leak test and packing of the [PH-220] housing assembly at [Riverside], on all shifts. It is based on PFMEA [PFMEA-PH220 rev C] and process flow [PF-PH220 rev B].
2. Reference documents
Customer drawing [C-88421 rev D] and specification [CS-114 leak tightness]
Process FMEA [PFMEA-PH220]
Work instructions [WI-PA-0405 to WI-PA-0420]
Measurement system analysis report [MSA-PH220-2026]
3. Control plan
Op no. | Process step | Machine / tool | Characteristic | Class | Specification / tolerance | Measurement method | Sample size | Frequency | Control method | Reaction plan |
|---|---|---|---|---|---|---|---|---|---|---|
10 | Receive castings | None | Material grade | SC | EN-GJL-250 | Supplier certificate review | 1 certificate | Every lot | Receiving inspection record | Reject lot; notify supplier; raise NCR |
10 | Receive castings | X-ray | Internal porosity | SC | No porosity over 1 mm in wall | X-ray inspection | 1 part | 1 per 50 | Inspection log | Quarantine lot; 100% X-ray; issue SCAR |
20 | Machine bore | CNC-07 | Bearing bore diameter | CC | 47.000 +0.025 / 0 mm | Air gauge AG-03 | 5 parts | Every hour | X-bar R chart | Stop; adjust offset; sort back to last good subgroup |
20 | Machine bore | CNC-07 | Bore position | SC | Ø0.05 mm to datum A | CMM program 220-20 | 1 part | Start of shift and after tool change | CMM report | Stop; quarantine since last check; call engineer |
20 | Machine face | CNC-07 | Joint face flatness | SC | 0.03 mm | Surface plate and dial indicator | 1 part | Every 2 hours | Check sheet | Stop; adjust; sort since last check |
30 | Press-fit bearing | Press P-02 | Press-in force | CC | 8–12 kN | Load cell force monitoring | 100% | Every part | Automatic reject outside window | Machine stops; part to red bin; team leader review |
40 | Fit cover and torque | Nutrunner, program P07 | Bolt torque | CC | 24 N·m ± 2 | Controller | 100% | Every bolt | Controller OK/NOK interlock | Do not release; replace bolt and gasket per WI-PA-0418 |
40 | Fit cover and torque | Click wrench TW-031 | Torque audit | SC | 22–26 N·m breakaway | Calibrated torque wrench | 1 part | Every hour | Hourly check sheet | Stop; verify tool; check parts since last audit |
50 | Leak test | Leak stand LT-01 | Leak rate | CC | ≤ 2.0 cc/min at 3 bar | Pressure decay test | 100% | Every part | Automatic pass/fail; part marked | Reject to red rack; master part check; NCR if 2 fails in an hour |
50 | Leak test | Leak stand LT-01 | Tester capability | None | Master leak part detected | Master leak part | 1 | Start of each shift | Daily check log | Do not run; call maintenance; retest the last shift’s parts |
60 | Label and pack | Label printer | Label content | SC | Matches order and part number | Barcode scan-to-print | 100% | Every carton | Scan interlock | Stop packing; check the last 10 cartons |
4. Incoming material control
Approved suppliers only (Approved Supplier List ASL-001).
Certificates of conformance required with every lot of castings, bearings and seals.
Skip-lot inspection allowed after 10 consecutive accepted lots; it reverts to every lot after any rejection.
5. Measurement systems
Gauges for CC and SC characteristics must have gauge R&R under 10% of tolerance (10–30% only with the quality manager’s approval).
All gauges are calibrated to schedule CAL-001, traceable to national standards.
Operators check air gauges against setting masters at the start of each shift.
6. Control of nonconforming product
Nonconforming parts go to the locked red quarantine area and are recorded on an NCR.
Only the quality manager can authorise use as is or rework; customer concessions need the customer’s written approval.
Repeat failures (two or more NCRs on the same characteristic in a month) open a CAPA.
7. Process change and requalification
Any change to tooling, machine, material, supplier, location or method is reviewed by the core team before it is made. PPAP is resubmitted where the customer requires it, and this plan, the PFMEA and the work instructions are updated together.
8. Records and retention
Record | Location | Retention |
|---|---|---|
SPC charts and check sheets | [Quality server, folder QR-PH220] | [Life of part + 1 year] |
Leak test and nutrunner data | [Line data server] | [15 years] |
NCRs and CAPAs | [Quality system] | [Life of part + 1 year] |
9. Approvals
Role | Name | Signature | Date |
|---|---|---|---|
Quality engineer | [Name] | [Date] | |
Manufacturing engineer | [Name] | [Date] | |
Production manager | [Name] | [Date] | |
Customer quality (if required) | [Name] | [Date] |