Quality Control Plan

A control plan for a part or process: characteristics, specifications, measurement methods, sample size, frequency and reaction plans.

Shown with sample data

Colour

Quality Control Plan: [PH-220 Pump Housing Assembly]

Control plan number

[CP-PH220]

Plan stage

☐ Prototype ☐ Pre-launch ☒ Production

Part number and revision

[220-1150 rev D]

Part name

[Pump housing assembly PH-220]

Customer

[Customer name], part number [C-88421]

Supplier / plant

[Northwind Components, Riverside plant]

Key contact and phone

[Quality engineer, phone]

Core team

[Quality, manufacturing engineering, production, maintenance]

Date (original / revised)

[Mar 2026] / [Nov 2026]

Customer approval (if required)

[Name, date]

1. Scope

This plan covers receiving, machining, assembly, leak test and packing of the [PH-220] housing assembly at [Riverside], on all shifts. It is based on PFMEA [PFMEA-PH220 rev C] and process flow [PF-PH220 rev B].

2. Reference documents

  • Customer drawing [C-88421 rev D] and specification [CS-114 leak tightness]

  • Process FMEA [PFMEA-PH220]

  • Work instructions [WI-PA-0405 to WI-PA-0420]

  • Measurement system analysis report [MSA-PH220-2026]

3. Control plan

Op no.

Process step

Machine / tool

Characteristic

Class

Specification / tolerance

Measurement method

Sample size

Frequency

Control method

Reaction plan

10

Receive castings

None

Material grade

SC

EN-GJL-250

Supplier certificate review

1 certificate

Every lot

Receiving inspection record

Reject lot; notify supplier; raise NCR

10

Receive castings

X-ray

Internal porosity

SC

No porosity over 1 mm in wall

X-ray inspection

1 part

1 per 50

Inspection log

Quarantine lot; 100% X-ray; issue SCAR

20

Machine bore

CNC-07

Bearing bore diameter

CC

47.000 +0.025 / 0 mm

Air gauge AG-03

5 parts

Every hour

X-bar R chart

Stop; adjust offset; sort back to last good subgroup

20

Machine bore

CNC-07

Bore position

SC

Ø0.05 mm to datum A

CMM program 220-20

1 part

Start of shift and after tool change

CMM report

Stop; quarantine since last check; call engineer

20

Machine face

CNC-07

Joint face flatness

SC

0.03 mm

Surface plate and dial indicator

1 part

Every 2 hours

Check sheet

Stop; adjust; sort since last check

30

Press-fit bearing

Press P-02

Press-in force

CC

8–12 kN

Load cell force monitoring

100%

Every part

Automatic reject outside window

Machine stops; part to red bin; team leader review

40

Fit cover and torque

Nutrunner, program P07

Bolt torque

CC

24 N·m ± 2

Controller

100%

Every bolt

Controller OK/NOK interlock

Do not release; replace bolt and gasket per WI-PA-0418

40

Fit cover and torque

Click wrench TW-031

Torque audit

SC

22–26 N·m breakaway

Calibrated torque wrench

1 part

Every hour

Hourly check sheet

Stop; verify tool; check parts since last audit

50

Leak test

Leak stand LT-01

Leak rate

CC

≤ 2.0 cc/min at 3 bar

Pressure decay test

100%

Every part

Automatic pass/fail; part marked

Reject to red rack; master part check; NCR if 2 fails in an hour

50

Leak test

Leak stand LT-01

Tester capability

None

Master leak part detected

Master leak part

1

Start of each shift

Daily check log

Do not run; call maintenance; retest the last shift’s parts

60

Label and pack

Label printer

Label content

SC

Matches order and part number

Barcode scan-to-print

100%

Every carton

Scan interlock

Stop packing; check the last 10 cartons

4. Incoming material control

  • Approved suppliers only (Approved Supplier List ASL-001).

  • Certificates of conformance required with every lot of castings, bearings and seals.

  • Skip-lot inspection allowed after 10 consecutive accepted lots; it reverts to every lot after any rejection.

5. Measurement systems

  • Gauges for CC and SC characteristics must have gauge R&R under 10% of tolerance (10–30% only with the quality manager’s approval).

  • All gauges are calibrated to schedule CAL-001, traceable to national standards.

  • Operators check air gauges against setting masters at the start of each shift.

6. Control of nonconforming product

  • Nonconforming parts go to the locked red quarantine area and are recorded on an NCR.

  • Only the quality manager can authorise use as is or rework; customer concessions need the customer’s written approval.

  • Repeat failures (two or more NCRs on the same characteristic in a month) open a CAPA.

7. Process change and requalification

Any change to tooling, machine, material, supplier, location or method is reviewed by the core team before it is made. PPAP is resubmitted where the customer requires it, and this plan, the PFMEA and the work instructions are updated together.

8. Records and retention

Record

Location

Retention

SPC charts and check sheets

[Quality server, folder QR-PH220]

[Life of part + 1 year]

Leak test and nutrunner data

[Line data server]

[15 years]

NCRs and CAPAs

[Quality system]

[Life of part + 1 year]

9. Approvals

Role

Name

Signature

Date

Quality engineer

[Name]

[Date]

Manufacturing engineer

[Name]

[Date]

Production manager

[Name]

[Date]

Customer quality (if required)

[Name]

[Date]

Text in [brackets] is yours to replace.

  • About
  • What’s included
  • How to use
  • Questions
  • Related resources

About this template

The control plan says how each important characteristic is kept in specification: what is checked, against which tolerance, with which gauge, how many parts, how often, by what control method and what happens when it is out. This template follows the AIAG APQP layout with a worked example for a machined and assembled pump housing, plus incoming material controls, measurement system requirements, nonconforming product handling, change control, records and approvals.

Who it’s for

  • APQP and PPAP submissions
  • Launching a new part or process
  • Customer and certification audits
  • Linking the PFMEA, work instructions and inspection

What’s included

  • 1. Scope
  • 2. Reference documents
  • 3. Control plan
  • 4. Incoming material control
  • 5. Measurement systems
  • 6. Control of nonconforming product
  • 7. Process change and requalification
  • 8. Records and retention
  • 9. Approvals

How to use it

  1. 1Fill in the header: part number, revision, plan stage (prototype, pre-launch or production) and core team.
  2. 2Take every process step and characteristic from the process flow and the PFMEA.
  3. 3For each characteristic, give the specification, measurement method, sample size, frequency and control method.
  4. 4Write a reaction plan that tells the operator exactly what to do with the process and with suspect product.
  5. 5Get customer approval where required, then update the plan with every process change.

Tips

  • Special characteristics (critical CC and significant SC) need the strongest controls: error-proofing or SPC, not occasional visual checks.
  • Every gauge in the plan should have a measurement system analysis (gauge R&R) result before production starts.
  • If the PFMEA, control plan and work instruction disagree, operators follow the work instruction, so keep all three in step.

Questions

What is the difference between a control plan and an inspection plan?

An inspection plan lists checks on the product. A control plan covers process and product characteristics, the controls that keep them in specification and the reaction when they are not.

What are prototype, pre-launch and production control plans?

Prototype covers dimensional and material checks during prototype builds; pre-launch adds extra checks between prototype and production; production is the ongoing plan for volume manufacture.

What does a reaction plan include?

What to do with the process (stop, adjust, call for help), what to do with product made since the last good check (quarantine, 100% sort) and who to notify.

Related searchesquality control plan templatecontrol plan templateapqp control planprocess control planqc plan manufacturinginspection plan template

Details

Format
Document
Category
Manufacturing & Operations
Setup
60 min
Level
Advanced
Price
Free

Download a copy

Downloads need a free account.

DocumentManufacturing & OperationsFree

Quality Control Plan

A control plan for a part or process: characteristics, specifications, measurement methods, sample size, frequency and reaction plans.

A free account keeps your copy safe so you can come back to it. Have one? Log in

Download a copy

Downloads need a free account.

Details

Format
Document
Category
Manufacturing & Operations
Setup
60 min
Level
Advanced
Price
Free

Your copy is private to you.

More manufacturing & operations templates

View all
Equipment Maintenance Log3 sheets

Overdue

1

Due in 14 days

3

Maintenance spend

$2,875

ABCD
1EquipmentLocationTypeInterval (days)
2Commercial espresso machineFront counterKitchen90
3Walk-in fridgeKitchenRefrigeration180
4DishwasherKitchenKitchen120
5HVAC unitRoofBuilding180
Assets
SpreadsheetManufacturing & Operations

Equipment Maintenance Log

Preventive maintenance due dates from each asset's service history, with overdue alerts, repair and downtime tracking, and maintenance cost by asset and month.

10 min setupPreview
Weekly Production Schedule3 sheets

Attainment

100%

Yield

99%

Downtime

160

ABCD
1DateLineOrder #Product
2Nov 5Line 1MO-871Sourdough loaf 800g
3Nov 5Line 2MO-872Granola bar 40g
4Nov 5Line 3MO-873Oat cookies 12pk
5Nov 6Line 1MO-874Seeded rolls 6pk
Schedule
SpreadsheetManufacturing & Operations

Weekly Production Schedule

Plan production orders by line, day and shift, then record output, scrap and downtime to see attainment, yield and performance by line and day.

10 min setupPreview
OEE Calculator2 sheets

Average OEE

79%

Availability

90%

Performance

90%

ABCD
1DateLineShiftPlanned minutes
2Nov 3Line 1Day450
3Nov 3Line 1Night450
4Nov 3Line 2Day450
5Nov 3Line 2Night450
Shifts
SpreadsheetManufacturing & Operations

OEE Calculator

Overall Equipment Effectiveness by shift: availability, performance and quality, and where time is lost.

10 min setupPreview

Practical guides and new resources, monthly.

One short email with new templates, calculators and how-tos. Unsubscribe any time.

GraviPointThe Centre of Productivity

Find the right resource. Make it work for you. Get things done with spreadsheets, documents, forms and calculators you can use right in your browser.

support@gravipoint.com
  • @gravipoint
  • @GraviPoint
  • GraviPoint
  • 𝕏@gravipoint

Templates

  • All templates
  • Budgets & expenses
  • Invoices & billing
  • Project management
  • HR & people
  • Inventory & stock
  • Sales & CRM
  • Financial calculators

Popular

  • Monthly budget
  • Invoice
  • Employee shift schedule
  • Weekly timesheet
  • Project plan & Gantt chart
  • Inventory tracker
  • Expense report
  • Mortgage calculator

Solutions

  • Individuals & households
  • Freelancers & consultants
  • Founders & startups
  • Small business owners
  • Teams & operations
  • Students & educators

Company

  • About
  • Features
  • Pricing
  • Community
  • Journal
  • Contact
© 2026 GraviPoint. All rights reserved.
  • Privacy
  • Terms
  • Help centre
  • FAQ