Overdue
1
Due in 14 days
3
Maintenance spend
$2,875
Equipment Maintenance Log
Preventive maintenance due dates from each asset's service history, with overdue alerts, repair and downtime tracking, and maintenance cost by asset and month.
FormManufacturing & OperationsFree
Record a nonconforming product the moment it is found: what, how many, against which requirement, containment and disposition.
Shown with sample data
A good NCR captures the facts before parts move or memories fade. This form records where the problem was found, the part, lot and quantities, the requirement and what was actually found, the containment taken, the disposition (use as is, rework, scrap, return to supplier) and who authorised it, plus whether a CAPA is needed. It works for incoming, in-process, final and customer-returned product.
Whenever product or material does not meet a specified requirement, whether found at receiving, in production, at final inspection or by the customer.
An NCR deals with the specific nonconforming product: contain it and decide what to do with it. A CAPA addresses the cause so it does not happen again. Not every NCR needs a CAPA.
Usually the material review board or a quality engineer with design authority. If the deviation affects the customer’s requirements, the customer must approve a concession first.
Download a copy
Downloads need a free account.