Construction Cost Estimate
Itemised estimate by trade with quantities, unit rates, markup and contingency.
SpreadsheetEstimates & BidsFree
Budget a new home by phase with committed and paid costs, forecast and variance for every line, and contingency tracking.
Shown with sample data
Budget a new home by phase with committed and paid costs, forecast and variance for every line, and contingency tracking.
Most home builds go over budget one line at a time. List every cost from permits to landscaping by phase with the budget, the amount committed in contracts and the amount paid so far; the sheet forecasts the final cost of each line, shows the variance, flags lines that are over or not yet bought out, and draws down a contingency so you always know how much cushion is left. A phase summary shows where the money goes.
Typically 10% of construction cost, more for older-site risks like rock, poor soil, long utility runs or custom designs.
Costs that are not physical construction: design and engineering, permits and fees, surveys, insurance, loan interest and closing costs. They are often 10–20% of the total.
Variance = budget − forecast. Forecast is the committed amount, or the amount paid if higher, or the budget if nothing is committed yet. A negative variance means the line is over budget and eats into contingency.