Construction Scope of Work

Define exactly what a contractor will and will not do: work included, exclusions, materials, schedule and payment.

Shown with sample data

Colour

Scope of Work

Project: [Project name and address] Client / contractor: [Name] Subcontractor / trade: [Name] Date: [Date] Reference documents: [Drawings A-101 to A-110 rev C; specification dated …]

1. Project overview

[Two or three sentences describing the project and this package of work.]

2. Work included

The contractor will supply all labour, materials, equipment and supervision to complete the following:

[Area or trade 1: e.g. Demolition]

  • [Remove existing kitchen units, worktops and flooring; dispose off site]

  • [Cap services and make safe]

[Area or trade 2: e.g. Carpentry]

  • [Frame new partition per drawing A-103, 2.4 m high, insulated]

  • [Supply and fit 3 internal doors with frames and ironmongery]

[Area or trade 3: e.g. Finishes]

  • [Tape, fill and sand all new plasterboard to level 4]

  • [Prime and apply two coats of paint to walls and ceilings; colours by client]

3. Work excluded

  • [Asbestos removal, if found]

  • [Electrical and plumbing work, by others]

  • [Permits and inspection fees]

  • [Repair of concealed defects discovered during the work]

4. Materials

Item

Supplied by

Specification

[Timber and sheet materials]

[Contractor]

[Grade, per spec section …]

[Doors and ironmongery]

[Contractor]

[Model, finish]

[Tiles and sanitaryware]

[Client]

[Delivered to site by date]

5. Standards and quality

  • Work will comply with [building code / regulations] and manufacturers’ instructions.

  • Work will be inspected at: [first fix, pre-plaster, completion].

  • Defects notified within [12 months] of completion will be corrected at no cost.

6. Site conditions

  • Working hours: [Monday to Friday, 08:00–17:00]

  • Access, parking and storage: [Details]

  • Protection of existing finishes and daily clean-up by the contractor

  • Health and safety: contractor to provide method statements and risk assessments

7. Schedule

Milestone

Date

Start on site

[Date]

[First fix complete]

[Date]

[Substantial completion]

[Date]

Final completion

[Date]

8. Price and payment

Fixed price: [$] [plus tax]

Stage

%

Amount

Deposit on signing

[10%]

[$]

[Milestone 1]

[40%]

[$]

[Milestone 2]

[40%]

[$]

Completion and sign-off

[10%]

[$]

9. Changes

Any change to this scope must be agreed in a written change order stating the price and time effect before the work is done.

10. Acceptance

Client / contractor

Subcontractor

Name: [Name]

Name: [Name]

Signature: ______________

Signature: ______________

Date: [Date]

Date: [Date]

Text in [brackets] is yours to replace.

  • About
  • What’s included
  • How to use
  • Related resources

About this template

Disputes on site are usually about scope, not workmanship. This document lists the work included by area or trade, what is excluded, who supplies materials, the standards to meet, the programme, the payment schedule and how changes are handled, so both sides price and build the same job.

Who it’s for

  • Subcontract packages
  • Home renovation contracts
  • Attaching to a bid request so quotes are comparable

What’s included

  • 1. Project overview
  • 2. Work included
  • 3. Work excluded
  • 4. Materials
  • 5. Standards and quality
  • 6. Site conditions
  • 7. Schedule
  • 8. Price and payment
  • 9. Changes
  • 10. Acceptance

How to use it

  1. 1Describe the work by area or trade in enough detail to price.
  2. 2List exclusions explicitly; silence causes arguments.
  3. 3Reference drawings and specifications by number and date.
  4. 4Attach it to the contract and have both parties initial each page.
Related searchesscope of work templateconstruction sowcontractor scoperenovation scope of worksubcontractor scope

Details

Format
Document
Category
Estimates & Bids
Setup
10 min
Level
Intermediate
Price
Free

Download a copy

Downloads need a free account.

DocumentEstimates & BidsFree

Construction Scope of Work

Define exactly what a contractor will and will not do: work included, exclusions, materials, schedule and payment.

A free account keeps your copy safe so you can come back to it. Have one? Log in

Download a copy

Downloads need a free account.

Details

Format
Document
Category
Estimates & Bids
Setup
10 min
Level
Intermediate
Price
Free

Your copy is private to you.

More estimates & bids templates

View all
Construction Cost Estimate3 sheets

Direct cost

$66,665

Bid price

$86,091

Margin in bid

14%

ABCD
1TradeItemQtyUnit
2Site prepExcavation & grading1lump sum
3ConcreteSlab foundation 4"1,200sq ft
4FramingWall framing1,850sq ft
5RoofingAsphalt shingles1,400sq ft
Estimate
SpreadsheetEstimates & Bids

Construction Cost Estimate

Itemised estimate by trade with quantities, unit rates, markup and contingency.

10 min setupPreview
Job Cost Tracker2 sheets

Budget

$621,000

Forecast at completion

$617,356

Projected over (−) or under budget

$3,644

ABCD
1DescriptionCategoryBudgetCommitted
2Site supervisionOverheads$48,000$48,000
3Excavation and groundworksSubcontractors$62,000$64,500
4Concrete: labourLabour$38,000$0.00
5Concrete: materialsMaterials$54,000$51,000
Job costs
SpreadsheetEstimates & Bids

Job Cost Tracker

Budget, committed and actual cost by cost code, with a forecast at completion and the variance to budget.

10 min setupPreview
Bid Comparison Sheet2 sheets

Packages

4

Awarded

1

Best bids vs budget

$1,800

ABCD
1PackageBidderBase bidExclusions to add
2ElectricalBright Spark Ltd$48,500$0.00
3ElectricalVolt Masters$44,200$3,800
4ElectricalBudget Electric$39,900$2,500
5PlumbingFlowRight$36,400$0.00
Bids
SpreadsheetEstimates & Bids

Bid Comparison Sheet

Level subcontractor bids by adding back exclusions and alternates, check insurance, licence and references, rank qualified bidders, and compare the best bid with your budget for each package.

10 min setupPreview

Practical guides and new resources, monthly.

One short email with new templates, calculators and how-tos. Unsubscribe any time.

GraviPointThe Centre of Productivity

Find the right resource. Make it work for you. Get things done with spreadsheets, documents, forms and calculators you can use right in your browser.

support@gravipoint.com
  • @gravipoint
  • @GraviPoint
  • GraviPoint
  • 𝕏@gravipoint

Templates

  • All templates
  • Budgets & expenses
  • Invoices & billing
  • Project management
  • HR & people
  • Inventory & stock
  • Sales & CRM
  • Financial calculators

Popular

  • Monthly budget
  • Invoice
  • Employee shift schedule
  • Weekly timesheet
  • Project plan & Gantt chart
  • Inventory tracker
  • Expense report
  • Mortgage calculator

Solutions

  • Individuals & households
  • Freelancers & consultants
  • Founders & startups
  • Small business owners
  • Teams & operations
  • Students & educators

Company

  • About
  • Features
  • Pricing
  • Community
  • Journal
  • Contact
© 2026 GraviPoint. All rights reserved.
  • Privacy
  • Terms
  • Help centre
  • FAQ